首页 news 公司概况 设备设施 修船业绩 服务网络 业务联系 招聘信息 协同办公
News Content
22000Tons of Floating Dock for CDC shipyard of Cuba Delivered

On April 29, the project of newly construction for CDC shipyard of Cuba -- 22,000 tons lifting capacity floating dock "VB0013A" was signed and delivered. The project was officially commenced on December 6, 2017, with a total construction period of 16 months and 22 days, more than one month ahead of the original contract construction period of 18 months. HRDD has highlighted all the key points of the project, ensures the high quality, safety and construction period, fulfills various contractual obligations, and the floating dock meet the design requirements and the specifications of Loyd‘s register. The successful delivery of the project marks one more breakthrough in new products business of HRDD.

In the speech of delivery ceremony, MD of HRDD Mr. Huang Haihua expressed that successful delivery of the floating dock, opens a good start of cooperation with CMC, and a bridge of friendship with CDC shipyard, wish the floating dock to create success in the future, for the CDC shipyard and Cuba‘s economic developments, we firmly believe that she is sure to bring more win-win cooperation between CMC and HRDD in the future, will further promote the development of relationships with the Republic of Cuba!

Chairman of GEMAR group Mr. Garcia, GM of general engineering department of CMC group, Mr. Yuan Yiping’ and Executive Director of HRDD, Mr. Liu Zhiyong,, signed the delivery documents on behalf of the parties. Mr. Garcia appreciated all parties for their efforts. He said the floating dock will become the most advanced equipment in the Caribbean region.

Consul General of Cuba in Shanghai Mr. Torres and his wife, MD of CDC shipyard Mr. Milian, and site construction team, LR Class, CMC site team, Secretary of the party committee of HRDD Mr. Xu Wei Guo, Technical Director Mr. Chen Jie and other relevant leaders also attended the delivery ceremony.

The 22,000-ton lifting floating dock is a non-standard customized product, which has certain construction difficulties. It can be completed and delivered on schedule in the low market conditions, which not only reflects the HRDD‘s excellent operation and management ability, but also reflects the HRDD‘s competitiveness in the new construction market, especially the construction of floating dock.

 

[2019-4-29 0:00:00 by HRDD]
Home | News | About us | Facilities | References | Partners | Conect us | Join us | Cooperative