首页 news 公司概况 设备设施 修船业绩 服务网络 业务联系 招聘信息 协同办公
News Content
HRDD Fabricating Cruise Watertight Doors can be comparable to the counterparts in Europe


Thanks to HRDD strategy enriched, steel structure fabrication was already the fourth major business. The professional management and good experienced & stable working teams strongly secured the project in good quality and timely delivery. On Mar 27th, 2nd batch of NV0029A Meyer Turku NB1396 and 1st batch of NV0040A Meyer Turku NB 1395 were delivered in FCA HRDD workshop term after FAT proceed inspected and approved by ship owner. 



HRDD won the order of three sets of cruise vessel watertight door fabrication in 2018, and projects are to be delivered in batches which first batch was already completed end of 2018. The projects were contracted with MCG which also supplied production drawings and site supervision. HRDD and MCG are longtime mutual cooperation successfully; HRDD already is the top priority of contractor to MCG in China. 


Cruise watertight door fabrication standard is very strict, especially in coating DFT control, electric parts installation & function test and precision control as well. The working teams always fully abide by technological standards and strive for excellence in fabrication. During first function test of Meyer Turku NB1396 1st batch in yard workshop, representative of Meyer Turku shipyard and vessel owner confirmed HRDD full ability in fabricating cruise watertight door, which can match Meyer Turku requirement.

[2019-3-29 0:00:00 by HRDD]
Home | News | About us | Facilities | References | Partners | Conect us | Join us | Cooperative