首页 news 公司概况 设备设施 修船业绩 服务网络 业务联系 招聘信息 协同办公
News Content
Winninging #6 & #7 Floating Crane Started Construction

At 10:18 am on December 18th, with the owner and ship inspection starting the plasma cutting machine button at the same time, the two floating cranes of Willing group no.6 and no.7 were officially started. Mr. Yu shan, general manager of Winning Qingdao management company, and Mr. Liu zhiyong, executive director of HRDD respectively sent congratulatory messages. The general manager of the Singapore logistics co., LTD., Mr. Zhu fei, director of ship management department, Zhu fei fei, supervisor of supervision Mr Liu jiqian and BV

surveyor,Mr shen jian together with yard’s production director Mr. zhang jian, chief engineer Mr. chen jie, director of relevant departments , members of the project team, etc., participated in the commencement ceremony. Since the construction contract of no.6 and no.7 floating crane came into effect in September, the company has drawn up a project team of powerful stuff and made detailed planning and arrangements in steel plate material procurement, production design drawing, workshop production resources and other preparatory aspects, ensuring the smooth start of the project.

Comparing with the No.4 & No.5 (WINNING BOFFA STAR and WINNING CONAKRY STAR), which have just been delivered, #6 & #7 are further optimized in design. The company‘s project team will continue to summarize project experience and strive for an early delivery to ship owner.

[2018-12-19 0:00:00 by HRDD]
Home | News | About us | Facilities | References | Partners | Conect us | Join us | Cooperative