Recently, Evergreen wrote a commendatory letter to Haixin team which is the labor engineering team subordinate to the hull workshop. Evergreen praised Haixin’s good work style and presented the banner of “Haixin Team, Wisdom and Bravery, Meritorious Work, Friends of Evergreen”.
Evergreen started its scrubber retrofitting projects cooperation with HRDD in 2018. In order to ensure the quality of the retrofitting, the hull workshop appoints an excellent construction team to participate in the retrofitting and strengthens the monitoring of the operation process. Haixin team has successively participated in the retrofitting of 3 types of scrubbers, Evergreen B, S and L. Among them, Evergreen‘s B-type and S-type scrubber retrofitting had all been completed. Haixin‘s construction quality of these two types of retrofitting projects has often won praise from the shipowner.
At present, the 13th ship of the L-type series ship refitted at Huarun Dadong. This project includes heightening the upper part, refitting the pump warehouse and installing the sea valve box. This work requires high technical requirements and is constructed by Haixin team. From the first ship to the present thirteenth ship retrofitting, the construction speed of Haixin team is getting faster. The quality is getting better and better, which makes the ship owner very satisfied.
The director of Haixin team stated that they have responsibility to ensure and expand the brand of HRDD. They will continue to work hard to complete every detail and successfully complete every project in order to let the shipowner trust HRDD’s ability. |