首页 news 公司概况 设备设施 修船业绩 服务网络 业务联系 招聘信息 协同办公
News Content
Dadong people won the “King of the Wind” with 29 repaired vessels safely berthing
Tang Hailong, the Secretary of the Chongming District Committee, came to the company for checking the works of flood control and typhoon resistance on August 9. Accompanied by Huang Haihua and Zhang Jian, Mr. Tang focused on inspecting the safety work of the company‘s Pier No. 6, 7 and 8. Mr. Tang and other leaders gave their approval for yard’s various preventive measures and stressed that it’s necessary to implement the main responsibility of enterprises for flood controls and strengthen the responsibility of emergency preparedness and personnel on duty and further improve and refine the pre-plans and face the challenge of flood control and typhoon resistance, ensuring the safety of enterprise property and employees.
Facing the once-in-70-years super typhoon ‘LEKIMA’, the company responded positively. Huang Haihua, the managing director of the company, presided over a special meeting on August 9, deploying the work of flood control and typhoon resistance. He asked cadres at all levels to fulfill their principal responsibilities and organize personnel to carefully check all the vessels of mooring conditions, key equipments and station protection measures, implementing the emergency support and eliminating the potential safety hazards. The secretary of the Party Committee Xu Weiguo, the production director Zhang Jian, the maintenance director Qian Hongxin and heads of relevant departments have attended the meeting.
There are a total of 29 vessels in yard as the super typhoon ‘LEKIMA’ approaches, which include 14 vessels for berthing, 7 vessels for anchoring, 7 vessels in docking and 1 ‘Cuban floating dock’ berthing at Shanghai Shipyard. The company’s flood control and typhoon resistance works are facing tremendous pressure and tough challenges. Vessels with the main engine working normally could be all anchored and stood by engines while the ones not working properly could be docked and berthed. Equipments of the key stations, high-altitude and land area are strengthened and 24-hour site-checks by cadres and employees are arranged by all departments.
The wind power in the Yangtze Estuary area has reached Force 12 in the evening of August 10. The bar of the container ‘Fair Winds’ in Rundong Dock was suddenly broken. The production service center immediately started the emergency response plan. Huang Haihua, Zhang Jian and other leaders remained calm in face of danger and participated in the site emergency rescue. With more than 3 hours’ efforts of the Emergency Rescue Team, leadership of Production Department and Production Service Center, heads of on-site scheduling and security teams, the potential safety hazard of M/V ‘Fair Winds’ was finally eliminated.
After 48 hours of vigorous defense and all-out fighting by the company‘s cadres and employees, the once-in-70-years super typhoon ‘LEKIMA’ are fortunately passed through and 29 repairing vessels are safely berthed.
[2019-8-15 0:00:00 by HRDD]
Home | News | About us | Facilities | References | Partners | Conect us | Join us | Cooperative