首页 news 公司概况 设备设施 修船业绩 服务网络 业务联系 招聘信息 协同办公
News Content
HRDD BEING FABRICATED LINKSPANS FOR EU MARKET
Calais link span is being proceeded as original production schedule, and would be first large steel structure project to enter the EU market.
The project was signed with MCG, and consists of pontoon, upper/lower ramps and upper/lower platforms including ballast system, electric system and hydraulic system. Its high technical requirement and tough fabrication period is challenging HRDD ability.
In order to ensure high quality completion of this project manufacturing, during leading time, yard carried out adequate production preparation ahead formulating detailed project scheme and process document. During project ongoing, the project team strictly strengthens control over safety, quality, technology, materials purchasing and invoice updating. Weekly meeting is implemented with MCG and BOUYGUES to guarantee the smooth forwarding.
MCG and BOUYGUES are rather satisfactory with the management of project plan, quality control and HSE supervision. Calais link span was steel cut on Dec of 2018, and to be delivered FOB HRDD on round Oct of 2019.
[2019-7-31 0:00:00 by HRDD]
Home | News | About us | Facilities | References | Partners | Conect us | Join us | Cooperative